Our Berlin Express was successfully delivered to us on 14 June. She is the first of twelve newbuildings with 23,600 TEU and dual-fuel propulsion. During the construction of the ship at the Hanwha Ocean shipyard (formerly Daewoo Shipbuilding & Marine Engineering Co., Ltd.), impressive pictures of the installation of the new tank have already been taken.